Everyone pays a monthly subscription and for the electricity they use. Only residents purchasing their own chargepoint for an underground car park pay a one-off charger and installation cost. If you use a shared chargepoint in an outdoor car park, there is no charge for the chargepoint or its installation.
Underground car parks: your one-off charger cost
If you are purchasing your own chargepoint for your allocated bay, the costs are:
Sync Energy 7.4kW socket charger, supplied and installed | £1,399 inc. VAT |
Less the OZEV EV Chargepoint Grant, if eligible and approved | -£500 |
Total one-off cost with an approved grant | £899 inc. VAT |
Without an approved OZEV grant, the one-off cost is £1,399 inc. VAT. This cost is charged in your first billing cycle once your charging service is up and running. Once you have paid in full, the charger belongs to you.
Outdoor car parks: no charger or installation cost
You use a shared chargepoint in a shared or visitor bay rather than purchasing your own. The chargepoint and installation cost you £0. You only pay the monthly subscription and for the electricity you use.
Everyone’s subscription: £14.90 per month inc. VAT
This covers:
- Use of Tohmo's charging infrastructure through your own underground chargepoint or a shared outdoor chargepoint
- Your RFID card or the app, for access and usage monitoring
- 100% renewable energy
- Ongoing maintenance and support
Everyone’s energy: 33.5p per kWh inc. VAT
You pay for the electricity you actually use, at a flat rate of 33.5p per kWh including VAT. There is no separate day and night rate.
Your energy is provided by Tohmo and supplied via Octopus Energy. We review our supplier periodically, so this may change.
What a typical month looks like
If you charge around 200 kWh in a month, which is roughly 700 miles of driving for most electric cars:
- £14.90 subscription
- £70.00 energy
- £84.90 in ongoing monthly costs
Public rapid charging in the UK averaged around 80p per kWh in summer 2026, and some networks charge as much as 93p per kWh. Charging at your own space at 33.5p per kWh is well under half that.
Billing begins once your charging service is up and running, from your Connection Date. If you are purchasing your own underground chargepoint, its one-off cost is included in your first billing cycle. Outdoor customers pay no chargepoint or installation cost.
Can these prices change?
Yes, but within limits. Both the energy price and the monthly subscription can be adjusted in line with the relevant Consumer Price Index, no more than twice in any 12 month period. We will always tell you at least one month before a change takes effect, and if you do not want to accept it you can end your contract.